Replacement of West Washington Avenue Bridge Over Pascack Brook
Town of Orangetown
West Washington Avenue Detour Plan
Project Update and Status - July 2020
The West Washington Avenue Bridge, which carries County Route 30 over the Pascack Brook has outlived its useful service life and is in need of replacement. The roadway approaches are short radius curves on steep grades that are difficult to navigate during adverse weather conditions. The channel alignment of Pascack Brook in relation to West Washington Avenue in the vicinity of the bridge results in embankment scour and roadway flooding during extreme storm events.
The project will replace the bridge with a new structure having improved hydraulic capacity, alignment and scour resistance. We anticipate that the new structure will be upstream of the existing bridge with the stream channel adjusted to improve its alignment with the structure and eliminate or minimize the potential for embankment and foundation scour. The bridge will be designed to accommodate all legal loads. The project will realign the approach roadways between Old Pascack Road and Highland Avenue to improve horizontal and vertical curves, and consider replacement of drainage systems.
A public meeting was held at the Orangetown Town Hall on May 29, 2019. At that meeting alternatives, which are shown here, were presented. It was determined that Alternative 2 would be advanced to the construction phase based upon input and discussions with the public and government officials and considering social and environmental consequences.
Construction is expected to begin in 2023 and should be complete by the fall of 2024